Sports Facility Construction Services Thailand | Winplus Sport
Sports facility construction across Thailand, Dubai and Southeast Asia since 2006
Concrete being poured on a construction site
Construction division

From bare ground to opening day

One contract covering design, earthworks, foundations, surfacing, fit out and documented handover. Most cost overruns in this industry happen in the gap between trades. A turnkey contract removes the gap.

Model
Turnkey
Contact
Single point
Stages
6
Crews
In house
Handover
Documented

What the construction division covers

Each capability below is available on its own, but they are designed to work as one contract with one accountable party.

Design only, earthworks only and surfacing only are all available. We would rather do one stage properly than lose a project over an all or nothing position.

How a Winplus project runs

Six stages, one accountable contractor. The handover between stages two and three is where most projects lose money, which is exactly where a turnkey contract removes the risk.

1

Site survey

Levels, soil, drainage and access measured on the ground. We tell you at this stage if the site is wrong for the facility you want.

2

Design and budget

Layouts, elevations, lighting plots and a bill of materials, priced against the standard you need to meet.

3

Earthworks

Stabilisation, compaction, drainage trenching and piling where load demands it. The stage nobody sees and everything depends on.

4

Base and slab

Base laid to tolerance, cured and tested for falls and moisture before a single layer of surface goes down.

5

Surface and fit out

Surfacing, marking, fencing, lighting, seating and equipment installed by our own crews, not subcontracted labour.

6

Inspection and handover

Quality control report, maintenance schedule and warranty documentation. We stay reachable after the invoice clears.

Design

Federation requirements are constraints on the drawing, not details added to it. Our design team sits alongside the crews who will build the drawing.

Architectural designDesignDetails
Output3D layouts and drawingsIncludesBills of materialComplianceFederation standardsCoordinationDesign and build in houseAlso coversElectrical and lighting

Draft copy. Technical claims here are placeholders written from general industry practice. The Winplus technical team should verify thicknesses, certifications and lead times before launch.

Run off distances, ceiling heights, sightlines, lux levels and egress routes are set by the sport and the sanctioning body. They are not preferences. A design that treats them as details to resolve later produces a facility that cannot host what it was built for.

Our design team works alongside the construction team that will build the drawing, which removes the most common and expensive failure in this industry: a beautiful design that cannot be built at the budget it was sold on.

We produce full technical documentation including 3D layouts, court elevations, electrical and lighting placement and accurate bills of material, so the project can be tendered or built directly.

Design deliverables

  • 3D layouts and visualisations
  • Court and field elevations with run off distances
  • Electrical placement and cable routing
  • Lighting plots with modelled lux levels
  • Drainage and falls design
  • Accurate bills of material for budgeting
  • Federation compliance review against the target standard

Design stages

1Brief and constraintsSport, level of play, capacity, budget and the site's physical limits established in writing.
2Concept layoutSpatial options tested against the plot, showing what fits and what does not.
3Technical designCourt elevations, drainage, electrical routing and lighting placement resolved.
4Bill of materialsAccurate quantities and specifications, which is what makes a budget real.
5Tender or build documentationA package that can go out to tender or straight into construction.

Common questions

Can we engage you for design only?
Yes. Plenty of clients use us for design and compliance review and then tender the build. We would rather produce a correct design than lose the project over it.
Will you review a design someone else produced?
Yes, and it is one of the most valuable things we do. Send the set and we will review buildability, surface specification and drainage before you go to tender.
How early should we involve you?
Before the architect finalises the plot layout. Spatial constraints are the single most expensive thing to discover late.

Discuss this with us

Foundation design and installationBuildDetails
ScopeSubgrade to slabIncludesPiling where requiredDrainageDesigned for tropicsTestingCompaction and levelAdvantageSame contractor surfaces it

Most failed sports surfaces in this region did not fail at the surface. They failed underneath, because the base was built by a general civil crew who had never laid a court and did not know what tolerances the sport demands.

Our operations target deep land stabilisation, meticulous earthwork, drainage layer trenching, compaction engineering and piling layout grids sized for sporting load stress. The playing surface simply does not last without these fundamentals established properly by sporting specialists.

Because we also install the surface, there is no gap between the civil contractor and the surfacing contractor for a problem to fall into, and nobody to blame when it does.

Earthworks scope

  • Site clearance, setting out and level survey
  • Deep land stabilisation and unsuitable material removal
  • Drainage layer design, trenching and installation
  • Layered fill and compaction with recorded test results
  • Piling design, installation and integrity testing
  • Sub base preparation to slab tolerance
  • As built records handed over with the project

Earthworks sequence

1Site clearance and surveyLevels taken, existing services located, the site stripped and set out.
2Excavation and stabilisationUnsuitable material removed, subgrade stabilised to carry sports loading.
3Drainage installationTrenching and drainage layers sized for tropical rainfall intensity, not average rainfall.
4Compaction engineeringLayered fill compacted and tested, with results recorded rather than assumed.
5Piling where requiredPiling grids installed and integrity tested on soft ground or podium structures.

Common questions

Why can a general contractor not do this?
They can dig. The difference is knowing the tolerances a sports surface requires and designing drainage for the rainfall this region actually produces. Those are the two things that decide whether the court lasts.
What happens if the ground is soft?
Piling, or deeper stabilisation. That is a geotechnical survey answer, not a guess, which is why the survey is the first thing we recommend.
Can you fix an existing court with a failed base?
Yes, but be clear that it is a rebuild rather than a resurface. We will tell you which one you are looking at after a survey rather than after you have paid for resurfacing.

Discuss this with us

Build

Surfacing and fit out by technicians employed directly, several of whom have close to 20 years with the company.

Sports surface installationBuildDetails
CoverageThailand and SEACrewsIn house techniciansMethodsManufacturer certifiedSystemsAll 9 we supplyOutputTested and documented

At Winplus Sport we deliver premium sports surface installation for projects ranging from community courts to internationally certified stadiums. Our team combines world class materials, precision engineering and professional installation techniques so every surface meets global performance and safety standards.

We serve Thailand, Vietnam, Malaysia, the Philippines and the wider region, partnering with top sports surface manufacturers trusted by the Olympics and professional tours.

Installation is carried out by our own technicians rather than subcontracted labour. On a system like PU, where the material cures in layers and cannot be spot repaired easily, that distinction is the whole project.

What we install

  • Tennis courts in acrylic, PU and cushioned systems
  • Pickleball courts to tournament standard surfaces
  • Futsal and football fields in high performance artificial turf
  • Athletics tracks in synthetic polyurethane systems
  • Multi sport flooring for schools, universities and complexes
  • Indoor wood, PU and PVC systems
  • Line marking, fencing, lighting and court equipment

Installation process

1Site assessment and preparationGround inspection, levelling and grading before any material is ordered.
2Foundation constructionEngineered for stability, drainage and longevity under sports loading.
3Surface installationPrecision application using manufacturer certified methods and cure times.
4Line marking and finishingPermanent, accurate and fade resistant markings set out to the federation standard.
5Quality assurance and testingFinal inspection against international sports federation requirements.

Common questions

Do you install surfaces you did not supply?
We prefer not to, because we cannot warrant material we did not source. If you already hold material, talk to us and we will tell you honestly whether we can work with it.
Do you use subcontracted labour?
No. Installation is by our own technicians, several of whom have been with us close to 20 years. On curing systems that is the difference between a floor that lasts and one that does not.
How long does installation take?
It depends on the system and the weather. Acrylic needs 24 to 48 hours of cure after the final coat. PVC can be down in days. PU is a layered system with cure time between each layer.

Discuss this with us

Project managementControlDetails
ModelTurnkeyContactSingle pointCoversDesign to handoverIncludesImport and shippingRegionThailand, SEA, Middle East

Winplus Sport is an emerging leader in sports construction and project management in Thailand and Southeast Asia. We design, build and manage sports facilities, arenas, seating systems and multi sport complexes for private developers, government agencies, schools and professional sports organisations.

From pickleball courts and tennis centres to padel facilities, futsal pitches and multi purpose arenas, we deliver complete turnkey solutions on time, on budget and to international standards.

The value of turnkey is not convenience, it is accountability. Most cost overruns in this industry happen in the handover between trades. One contract removes the gap, and removes the argument about whose fault it was.

Why clients hand us the whole project

  • Southeast Asia market knowledge combined with international construction methods
  • One point of contact from concept to completion
  • Exclusive access to top tier flooring, seating and equipment suppliers
  • Import and shipping logistics handled inside the scope
  • Quality control and safety compliance monitored on site
  • Eco conscious materials and construction techniques
  • Warranties, documentation and maintenance support after handover

How a managed project runs

1Site surveyLevels, soil, drainage and access measured. We tell you here if the site is wrong for the facility.
2Design and budgetLayouts, elevations, lighting plots and a bill of materials priced to the standard you need.
3Procurement and logisticsGlobal sourcing, import and shipping coordinated into the programme, not after it.
4Construction oversightQuality control, safety compliance and progress monitoring on site.
5Surface and fit outSurfacing, marking, fencing, lighting, seating and equipment by our own crews.
6Inspection and handoverDetailed quality checks, warranties, documentation and maintenance support.

Common questions

What does turnkey actually include?
Site survey and feasibility, design, earthworks and foundations, the playing surface, lighting, fencing, seating and equipment, quality control inspection and handover documentation.
Can you manage a project we have already started?
Yes, though it is harder, and the first thing we will do is inspect what has been built so far rather than take it on trust.
Do you work outside Thailand?
Yes. We deliver across Southeast Asia and the Middle East including Dubai, with sourcing and shipping logistics inside the turnkey scope.

Discuss this with us

Control

Every buried layer tested and recorded before the next one covers it, with the documentation handed over at completion.

Quality control inspectionControlDetails
StagesEvery buried layerOutputWritten recordsStandardsFederation and manufacturerHandoverFull documentation packAlso coversWarranty registration

Draft copy. Technical claims here are placeholders written from general industry practice. The Winplus technical team should verify thicknesses, certifications and lead times before launch.

Sports construction buries most of its work. Compaction, drainage, reinforcement and slab moisture are all invisible by the time the facility opens, which is exactly why they need to be tested and recorded as the project proceeds rather than certified at the end.

We inspect and document at each stage, and the records go to the client at handover. For government, school and federation projects this documentation is frequently a funding condition rather than a nicety.

The same discipline applies to the finished surface. Final inspection checks the installation against the manufacturer specification and the relevant federation standard, and the result is written down.

What you receive at handover

  • Compaction and bearing test records
  • Drainage as built levels and connections
  • Slab flatness and moisture test results
  • Surface system batch records and installation dates
  • Line marking verification against the federation standard
  • Manufacturer warranty registration
  • Maintenance schedule specific to the installed system

Inspection points

1Subgrade and compactionBearing and compaction tested and recorded before fill goes over it.
2Drainage installationFalls, invert levels and connections checked before backfill.
3Slab and reinforcementSteel placement, cover and finished flatness verified before surfacing.
4Moisture testingSlab moisture tested and passed before any surface system is bonded to it.
5Final surface inspectionFinished system checked against manufacturer specification and federation standard.

Common questions

Why does this matter if the facility looks fine?
Because the layers that fail first are the ones you cannot see. Documented testing is what distinguishes a facility that will still perform in year eight from one that looks identical on opening day.
Do funders ask for this?
Frequently. Government and institutional projects often make documented quality control a condition of payment, and retrofitting records is not possible.
Can you inspect a project another contractor built?
Yes. Independent inspection of work in progress or of a completed facility is available as a standalone service.

Discuss this with us

The survey is the first spend and the one that saves the most

Send us the site location and what you want to build on it. What the ground can carry shapes everything that follows.