
Arenas built to federation mandate
Grandstands, roofing, lighting and crowd safety parameters govern arena projects. We coordinate multi disciplined teams to bring complex architectural concepts to ground reality, from floor layout through to crowd routing.
- Scope
- Ground to roof
- Seating
- Fixed and retractable
- Lighting
- To lux standard
- Surfaces
- 9 systems
- Standards
- Federation mandate
An arena is five projects at once
Seating, roofing, lighting, surface and the ground underneath all constrain each other. Procuring them separately is how venues end up with lighting that cannot be mounted and seating that blocks sightlines.
Everything below is available as part of a turnkey arena or as an individual package into a project another contractor is leading.
Structure
Foundations, slabs and roofing. An arena imposes loads a normal building does not, and all three are decided by the geotechnical survey rather than by the drawing.
Foundation systemsArena structureDetails
An arena imposes loads that a normal building does not. Grandstands concentrate weight on a small footprint, roof structures carry wind uplift across long spans, and the playing surface itself has tolerances measured in millimetres that the ground beneath must hold for decades.
We design and install the foundation system against a geotechnical survey rather than against an assumption. Soil in much of Thailand is soft and highly variable across short distances, which is why two sites a kilometre apart can need completely different answers.
Our team includes geotechnical engineering expertise, which is unusual for a sports contractor and is the reason clients bring us in before the architect has finished drawing.
What the foundation package covers
- Geotechnical survey coordination and interpretation
- Structural load modelling for seating, roofing and surfaces
- Pad, raft and piled foundation design
- Piling installation and integrity testing
- Ground stabilisation and compaction to sports loading
- Drainage layer design and trenching
- As built documentation and test records for handover
How a foundation is decided
Common questions
- Why does a sports facility need special foundation design?
- Because the loads are unusual. A grandstand concentrates weight, a long span roof fights uplift, and the playing surface needs millimetre tolerances held for decades. A general building foundation is not designed for that combination.
- Do you carry out the geotechnical survey?
- We coordinate and interpret it. The survey is the first spend on any serious project and it is the one that saves the most money, because it tells you what the site can actually carry.
- Can you work from another engineer's foundation design?
- Yes. We will review it against the sports loading first and tell you plainly if we think it is under specified.
Concrete slab systemsArena structureDetails
Every surface we install sits on a slab, and every surface failure we are called in to diagnose traces back to one of three things: the slab was not flat enough, it was not cured properly, or it fell the wrong way.
We design and pour slabs specifically for sports use, which means specified tolerances, controlled joint placement, moisture testing before surfacing and falls that move water where you want it rather than where gravity found it.
For indoor venues the slab also has to be dry enough to bond with the surface system. Laying an expensive floor over a slab that is still releasing moisture is one of the most expensive mistakes in this industry.
Slab scope
- Sub base preparation, compaction and proof rolling
- Reinforced slab design for sports loading
- Falls designed for tropical rainfall volume
- Controlled joint layout to manage cracking
- Flatness tolerance to the surface manufacturer's requirement
- Moisture and level testing with recorded results
- Crack repair and remediation on existing slabs
Slab sequence
Common questions
- Can you surface over our existing slab?
- Often yes. We test it for cracking, falls and moisture first. If it passes, resurfacing is a fraction of a rebuild cost. If it fails, surfacing over it hides the problem for a season and you pay twice.
- How flat does a sports slab need to be?
- It depends on the surface system going on top, and the manufacturer sets the number. That is why the slab and the surface should be quoted by the same contractor.
- What causes slabs to crack?
- Usually curing that was rushed, joints that were not designed, or a sub base that moved. All three are avoidable and all three are expensive to fix later.
Roofing solutionsArena structureDetails
Draft copy. Technical claims here are placeholders written from general industry practice. The Winplus technical team should verify thicknesses, certifications and lead times before launch.
An uncovered court in Thailand loses playing hours to rain for months and to heat in the middle of the day for the rest of the year. A roof converts those lost hours into bookable ones, which is why covered facilities carry very different revenue models from open ones.
We deliver long span roofing for open sided covered courts and fully enclosed arenas, designed for the wind uplift and rainfall intensity this region actually produces rather than a generic loading.
Roof design also drives lighting and ventilation. Getting all three resolved together at design stage is far cheaper than retrofitting light mounting points into a finished structure.
Roofing scope
- Long span steel structures for courts and arenas
- Open sided covered court structures
- Fully enclosed arena envelopes
- Integrated lighting mounting and cable routing
- Ventilation strategy for open and enclosed venues
- Rainwater collection and discharge design
- Structural certification documentation
Roof design sequence
Common questions
- Does a roof need to be added at build time?
- No, but it is considerably cheaper then. Retrofitting a roof over a finished court means working around the surface you just paid for, and protecting it during the work.
- What ceiling height do we need?
- It is set by the sport. Badminton needs nine metres clear for competitive play, basketball seven. Build for the most demanding sport in your timetable.
- Open sided or enclosed?
- Open sided handles rain and sun at a fraction of the cost. Enclosed gives climate control and the ability to run events, but brings ventilation and lighting costs with it.
Spectator
Seating and lighting. Capacity is the output of sightline modelling and egress routing, not the input, and lighting decides how many hours the venue can sell.
Stadium seating solutionsArena spectatorDetails
Draft copy. Technical claims here are placeholders written from general industry practice. The Winplus technical team should verify thicknesses, certifications and lead times before launch.
Clients usually arrive with a seat count. The harder questions are whether every seat can actually see the playing area, how the crowd gets out in an emergency, and whether the structure underneath carries a full house safely.
We supply and install fixed grandstands, retractable telescopic systems for multi purpose halls and modular seating for temporary and event use. Retractable systems are particularly valuable in school and municipal halls, where the same floor has to serve sport, assemblies and events.
Sightline modelling and egress routing are part of the design rather than something checked afterward, because both are extremely expensive to correct once steelwork is fabricated.
Seating scope
- Fixed grandstand systems
- Retractable telescopic seating for multi purpose halls
- Modular and temporary event seating
- VIP, media and accessible seating positions
- Sightline modelling and capacity planning
- Egress routing and crowd safety design
- Structural certification and handover documentation
Seating design sequence
Common questions
- What is retractable seating?
- Telescopic stands that fold back against a wall when not in use. It is the answer for a hall that has to be a sports venue on Saturday and an assembly space on Monday.
- Can seating be added to an existing venue?
- Yes, though the structure has to be checked for the additional load and the egress routes reassessed for the higher capacity.
- Do you handle accessible seating?
- Yes. Accessible positions, companion seating and the access routes to reach them are part of the layout design rather than an afterthought.
Lighting solutionsArena spectatorDetails
Draft copy. Technical claims here are placeholders written from general industry practice. The Winplus technical team should verify thicknesses, certifications and lead times before launch.
A court without lighting loses the majority of its bookable hours, because in this climate players avoid the middle of the day and arrive in the evening. That single fact changes the business case for lighting from an optional extra into the item that determines facility revenue.
Lighting is also a compliance question. Federation sanctioned play requires specified lux levels on the playing surface, and broadcast requires considerably more. If your venue intends to host anything, the lighting design has to be able to prove it meets the number.
We design to lux levels, uniformity and glare control rather than to fitting count, and we position fittings off the line of play for sports where players look upward.
Lighting scope
- Photometric design with modelled lux and uniformity
- LED fittings specified to the sport and level of play
- Glare control and aiming design
- Pole, roof and wall mounting systems
- Cable routing, distribution and controls
- Zoned switching so partial courts can be lit economically
- On site commissioning with measured verification
How a lighting design is produced
Common questions
- What lux level do we need?
- It depends on the sport and whether you intend to host sanctioned or broadcast events. Recreational play, competition and broadcast are three very different numbers and three very different budgets.
- Can lighting be retrofitted?
- Yes, and it is one of the highest return upgrades available to an existing facility, because it converts unusable evening hours into bookable ones.
- Why does glare matter so much?
- In badminton, tennis and volleyball players look directly upward. A fitting in the wrong position makes the venue unusable for those sports regardless of how bright it is.
Playing area
The surface itself, plus the protective systems that let the venue host concerts and exhibitions in the weeks between fixtures.
Arena playing surfacesArena playing areaDetails
Winplus Sport has been a sports surface expert in Southeast Asia for nearly 20 years, servicing all sports and all scopes of project. We install premium surfaces used in competition around the world, from the Olympic Games to professional tours.
We also understand that not every client needs a competition facility. Alongside the certified systems we carry a full line of premium quality, budget conscious options for schools, residential developments, commercial facilities, hotels and condominiums.
Whether the requirement is a modular flooring system or a permanent installation, the specification is driven by the level of play you intend to host and the hours the facility will carry.
What arena surfacing covers
- Permanent indoor systems in wood, PU and PVC
- Outdoor acrylic and cushioned acrylic court systems
- Artificial turf for football, futsal and padel
- Modular and liftable systems for multi use venues
- Competition line marking sets for multi sport timetables
- Surface testing and certification documentation
- Supply only packages for contractors already on site
Common questions
- How is this different from the flooring systems section?
- Same systems, different starting point. The flooring section helps you choose a material. This page is about specifying a surface inside a full arena build where the slab, the roof and the lighting are being built at the same time.
- Can you match a federation specification?
- Yes. Tell us which federation and which level of play, and the specification follows from that rather than from a product catalogue.
- Do you offer modular systems?
- Yes. Liftable and modular systems are the right answer for venues that need to convert between sport and non sport use.
Event flooringArena playing areaDetails
Draft copy. Technical claims here are placeholders written from general industry practice. The Winplus technical team should verify thicknesses, certifications and lead times before launch.
A venue that can only host sport is a venue with empty weeks in its calendar. Event flooring is what allows an arena to take a concert, a graduation, an exhibition or a corporate dinner without risking the playing surface that cost you a large part of the build budget.
Protective systems lay over the existing floor and carry foot traffic, staging, seating and in some cases vehicles. Temporary sports systems do the reverse, creating a playable court inside a space that is not normally a sports venue.
Both are available on a supply basis or fully managed, where our crews install before the event and strike after it.
Event flooring scope
- Protective covering for wood, PU and PVC sports floors
- Heavy duty decking for staging and equipment loads
- Temporary sports court systems for non sport venues
- Modular tiles for exhibitions and trade shows
- Install and strike within event turnaround windows
- Storage trolleys and handling equipment
- Rental packages for one off events
Common questions
- Will event flooring damage our sports floor?
- Correctly specified protective flooring is designed to prevent exactly that. The risk comes from using the wrong system or from letting staging contractors load a bare sports floor.
- How quickly can it be installed?
- Turnaround depends on the venue size and the access, and it is designed around your event schedule. Our crews work to the strike deadline rather than to office hours.
- Can we rent rather than buy?
- Yes, through our events division. Renting makes sense until the event calendar is regular enough to justify owning the system.
Designed to the mandate, not to a preference
Seating capacity, sightlines, lux levels, run off distances and crowd egress routes are written into the mandate of whichever federation certifies your venue. They have to be in the drawings from the first sketch, because retrofitting compliance into a built structure is the most expensive work in this industry.
Bring us the capacity target and the plot
We will tell you what fits, what federation requirements constrain it and what it costs, before anyone draws anything.