Sports Facility Construction Thailand | Courts, Tracks and Arenas | Winplus Sport
Sports facility construction across Thailand, Dubai and Southeast Asia since 2006
Curved red running track in an outdoor stadium

Courts, tracks and arenas built to compete.

Winplus Sport is a turnkey sports facility contractor working across Thailand, Dubai and Southeast Asia. We take a project from ground survey through foundations, surfacing and equipment to a facility that meets international standards.

Years building
20
Markets delivered in
7
Combined engineering
50+ years
Model
Turnkey
Supply only
Available

The names behind the build

General contractors, international schools, hotel groups, developers, government agencies and sports associations have put their facilities in our hands. We install only from suppliers whose systems are certified for competition play.

Material and brand partners

Certified supply chain
Marathon
Harper
Alcor
Vigano Pavitex
Decoturf
acrylic colour systems
Domo
artificial turf

Clients, federations and sponsors

Selected
Partner organisation
Partner organisation
Partner organisation
Partner organisation
Partner organisation
Partner organisation
Partner organisation
Partner organisation
Partner organisation

How a Winplus project runs

Six stages, one accountable contractor. Most cost overruns in this industry happen in the handover between stages two and three, which is exactly where a turnkey contract removes the risk.

1

Site survey

Levels, soil, drainage and access measured on the ground. We tell you at this stage if the site is wrong for the facility you want.

2

Design and budget

Court layouts, elevations, lighting plots and a bill of materials, priced against the federation standard you need to meet.

3

Earthworks

Stabilisation, compaction, drainage trenching and piling where load demands it. The stage nobody sees and everything depends on.

4

Base and slab

Base laid to tolerance, cured and tested for falls and moisture before a single layer of surface goes down.

5

Surface and fit out

Surfacing, line marking, fencing, lighting, seating and equipment installed by our own crews, not subcontracted labour.

6

Inspection and handover

Quality control report, maintenance schedule and warranty documentation. We stay reachable after the invoice clears.

See our construction services

Sports we build for

Every sport we serve in one table. Open any row for the detail and a way to get it quoted.

SportWhat we supplyDetails
PadelCourts, glass and lighting
PickleballCushioned outdoor and indoor courts
TennisHard, clay and acrylic courts
BasketballIndoor and outdoor courts
BadmintonCushioned hall flooring
VolleyballHall flooring and equipment
FutsalArtificial turf pitches
FootballFull and small sided pitches
Table tennisFlooring and equipment
Boxing, MMA and Muay ThaiFight gym surfaces
Athletics and running tracksPolyurethane track surfaces
Multi sport hallsOne floor, several sports

A court is only as good as the ground under it

Most failed sports surfaces in this region did not fail at the surface. They failed underneath, because the base was built by a general civil crew who had never laid a court and did not know what tolerances the sport demands.

  • Deep land stabilisation and compaction to sports loading
  • Drainage layers designed for tropical rainfall volume
  • Piling grids where soft ground or podium loading requires it
  • Slab falls checked to millimetre tolerance before surfacing
Read about our earthworks
Excavator carrying out earthworks on a construction site
Site preparation. Replace with Winplus project photography.
Architectural sketches and blueprints on a design desk

Led by people who have been on site for 20 years

Winplus Sport is led by industry veteran Charinee Yoosawai. Our multinational team brings more than 50 years of combined expertise across geotechnical engineering, sports facility design, construction management and event operations. That mix is why a Winplus project does not stall between the engineer, the architect and the installer. They are all in the same room.

Our clients include general contractors, international schools, hotel chains, developers, government agencies and sports associations. Their success is our reputation, which is the only reason this business has lasted two decades.

Read our story

Questions we get asked first

How long does it take to build a padel or pickleball court in Thailand?

A standard outdoor court on prepared ground takes six to ten weeks from site handover. Projects that need piling, drainage or a new concrete slab typically run twelve to sixteen weeks. Rain season scheduling is planned into the programme from the start.

Do you work outside Thailand?

Yes. We deliver across Southeast Asia and the Middle East, including Dubai. Material sourcing and shipping logistics are handled inside the turnkey scope.

Can you resurface an existing court instead of rebuilding it?

Often yes. We survey the slab for cracking, falls and moisture first. If the base is sound, an acrylic or cushion resurface restores play at a fraction of a rebuild cost. If the base has failed, resurfacing only hides the problem for one season.

Do you supply materials without installing them?

Yes. Surfaces, flooring systems, court equipment, scoreboards, fencing and seating can all be supplied as a standalone package for a facility you already own.

Start with a site survey, not a catalogue

Levels, soil, drainage and access decide more about your facility than any product page will. We measure first and recommend second.